3D printed spare parts
Ten years of spare parts.
Zero warehouse.
Genesys Vault turns the long-tail spare-parts catalogue into a protected digital warehouse. Every part is produced only when needed, on a certified node close to the customer. The know-how stays yours.
With your The Genesys account. We usually review requests within 2 working days. · What the law requires
A turnkey digital spare-parts warehouse.
Printer, activation, protected files, production. Start from a pilot site and extend it to your other sites and countries, with no more customs costs and lower shipping costs.
| What we give you | What it includes | |
|---|---|---|
| The printer | Professional, with an enclosed chamber for technical materials, already connected to Hermes and with starter material. One per site. For special needs, dedicated printers. | |
| Activation, once per site | We pick the right part numbers in your catalogue with you; install printer, Hermes, company account, users and permissions; print and check the first parts with tuned materials; train your staff; support you for three months. | |
| Your files in the Vault | Every uploaded part becomes a protected file: never downloadable, delivered encrypted only to the printer that produces it. A fee at upload, then every year to keep it protected and ready to produce. | |
| Production | No per-part cost on your printers. Where your sites do not reach, an authorised printer in the network produces the part, at a fixed production cost we calculate. |
Already have a digital warehouse? With The Genesys it becomes secure, easy to use and easy to control. Our system prepares every model for the use you will make of it and keeps the quality always the same: it prints with one click, from the platform or the app, even by non-specialist staff. Even a child could produce your gear.
Your printers can work for others too, only if you decide so.
Your printers and those of other Vault customers can work as a network. Only if you choose, you open your printers to other Vaults’ prints: machines stay idle less and every print made for others becomes income. In return you get access to a distributed production network: when you need a part far from your sites, a printer in the network produces it, at a fixed cost we calculate. The file stays protected in every case: whoever prints never sees it.
Accessories and customisations.
Sold as a right to print: the customer produces them at home or at a printer in the network, and you decide how many copies.
The Vault is yours, at a single site or spread across sites. You use The Genesys network if you want it.



Millions of spare parts to guarantee. No warehouse can carry them.
The cheapest spare part is the one you don’t have to stock.
Keeping a spare-parts warehouse costs 20–30% of its value every year. With Vault the long-tail catalogue becomes a set of protected files: no obsolescence, no downtime waiting for the part.
| PHYSICAL | VAULT | |
|---|---|---|
| Annual cost | 20–30% of the value | Only what gets printed |
| Lead time | Weeks | Hours |
| Obsolescence | Parts stuck on the shelf | None |
| Logistics and duties | Transport, customs, packaging | Local production |
| Traceability | Partial | Proof of Print per part |
Outsource production. Not the know-how.
- 01The file never travels in the clearRun on the machine with multiple encryption, then the keys are deleted.
- 02Counted copiesEvery print needs a Right to Print: you decide how many and where.
- 03Consistent qualitySlicing is centralised: the same part, identical, on different nodes.
- 04Compliance by designProof of Print and reporting for the right to repair and the Digital Product Passport.
From the catalogue to the first certified part.
You request your Vault online: upload your spare parts, set the rules and share them with your repairers.
- 01Request your Vault.Company name, VAT number and how many spare parts you have. We review the request and your Vault starts with the annual fee.
- 02Upload your spare parts.One at a time or in bulk. For every part you know straight away whether it’s printable or needs a review.
- 03Set the rules.Price, how many copies and who prints them: the whole network, certified nodes only, or your own printers.
- 04Share and track.A link or a code for your repairers. Every part is made near them, with its Proof of Print.
- Home appliances
- Furniture
- Consumer electronics
- Automotive and classic cars
- Mobility
Open your Vault.
Request it with your account and run it yourself: spare parts, prices, copies, reports. You pay a fee for each part you upload. No per-part cost on your printers; when the network prints, a fixed production cost. And if you open your printers to other Vaults, every print for them is income for you.
Rather talk it through first? Book the assessment of your catalogue.
We’ll show you which spare parts you can move into the Vault and how much warehouse you free up.
Rather we call you back? Leave us your details.